HOW TO INSTALL
TRANSIT INSTALLATION

Step 1: Install the four orange vertical A-frame pieces per the video instructions.

Step 2: Secure the 4 vertical L-Tracks to their corresponding orange A-frame pieces

Step 3: Bolt the horizontal MOAB bed rails to the vertical L-tracks using the provided gold L-Track studs

Step 4: Install MOAB bed panels onto the horizontal MOAB bed rails

 

**Please note: The only A-Frame components that come with the MOAB bed install kit are TH1, TH2, TH3, and TH4. No horizontal A-frame components are included with this kit.